P0RejectionReasonCode
CNMC rejection reason codes for electricity supply point P0 responses (Table 27 of the CNMC specification).
Values
-
R01Supply point associated with the CUPS does not exist.
-
R02No prior ATR contract in force.
-
R03NIF/CIF does not match the NIF/CIF on the contract in force.
-
R06A prior ATR request is already in progress.
-
R07Contract type is not provided or is invalid.
-
R08Contract end date is not provided or is invalid.
-
R09A court judgment relating to the customer's debt exists.
-
R11Incorrect retailer.
-
R12Contract cut off for non-payment.
-
R14Requested power exceeds the maximum authorised power at low voltage.
-
R15Incorrect power sequence: Pi > Pi+1.
-
R17Tariff is not valid for the supply voltage.
-
R18New customer-owned equipment does not meet ATR contracting criteria.
-
R20Installation unavailable or supply expansion in progress (open docket, docket code, and docket reason).
-
R21A prior contract is already in force.
-
R22Requested power exceeds the maximum recognised extension power.
-
R23CNAE is not provided or is invalid.
-
R26Access blocked more than twice for reasons beyond the distributor's control.
-
R27ICP box is invalid or does not exist.
-
R28Rejection due to anomaly.
-
R29Customer equipment missing.
-
R31Holder's objection.
-
R32Essential supply.
-
R34Customer cannot be disconnected by court or administrative order.
-
R35Customer already disconnected.
-
R36Incorrect NIF/CIF.
-
R37A prior A3 request is already in progress.
-
R38A prior C1 request is already in progress.
-
R39A prior C2 request is already in progress.
-
R40A prior M1 request is already in progress.
-
R42Cancellation is not possible: work order already in the field or non-cancellable actions within a claim.
-
R43Cancellation is not possible: request already activated.
-
R46Requested operation date is retroactive.
-
R47Power values not normalised for a three-phase supply.
-
R48Power values not normalised for a single-phase supply.
-
R49Voltage change from single-phase to three-phase is required.
-
R50Measurement transformers out of range.
-
R52Tariff is not valid for the requested power.
-
R53A connection docket must be opened.
-
R54Temporary bulletin does not exist.
-
R55New customer is the same as the current customer.
-
R56Field 84 data missing in modification.
-
R57Low-voltage technical documentation is missing.
-
R58Contact phone number is missing.
-
R59Cabinet/module is invalid or does not exist.
-
R60Installation is incomplete or contains invalid elements.
-
R61CGP is invalid or does not exist.
-
R62Action requested by the retailer does not match the customer's requirements.
-
R63Requested power cannot be less than the BIE power (non-interruptible Mode 2 supplies).
-
R64Disconnection is not technically possible at the cut-off point.
-
R65More than one power modification at a supply point within 12 months for the same supply point holder.
-
R66Remote-managed supply.
-
R67Supply with maximum demand meter.
-
R68Not permitted for a free-market retailer.
-
R69The distributor disagrees.
-
R70Retailer is disabled.
-
R71Multiple contracts exist for the same supply point.
-
R72Contract cancelled.
-
R73Supply with power greater than 15 kW.
-
R74Supply with more than one meter.
-
R75Discrepancy between reading information and number of integrators.
-
R76More digits than number of meter wheels.
-
R77Reading is lower than the last actual reading.
-
R78Excessive consumption.
-
R79Reading period is too short.
-
R80Supply with maximum demand meter and/or reactive energy.
-
R83Energy poverty.
-
R84Duplicate claim.
-
R85Mandatory field 'xxxx' missing.
-
R86Connection docket code is incorrect.
-
R87Invoice does not exist.
-
R88Invoice is not remotely managed.
-
R89No best available curve (no curve generated).
-
R90Self-consumption type 1 or 2B: consumption holder does not match the installation holder.
-
R91Self-consumption: associated contract request is missing.
-
R92Self-consumption: the self-consumption category in the request does not match the one registered at the distributor.
-
R93Self-consumption: self-consumption type is invalid.
-
R94Self-consumption: impossible to process request for this supply point.
-
R95Self-consumption: requested modality does not match the technical contract.
-
R96Self-consumption: contracted power exceeds 100 kW.
-
R97Self-consumption: contracted power is less than the installed generation power.
-
R98Self-consumption: minimum permanence period in self-consumption modality not respected.
-
R99Other.
-
RA1Unresolved incidence.
-
RA2Contract cut off by the distributor.
-
RA3Dangerous installation.
-
RA4Rejection of the retailer's request.
-
RA5Power above/below the contract type.
-
RA6Requested power differs from the authorised power.
-
RA7Authorisation date has expired.
-
RA8Ministerial authorisation required.
-
RA9Requested power exceeds the maximum authorised power at high voltage.
-
RB1High-voltage technical documentation is missing.
-
RB2Rejection due to confirmed fraud.
-
RB3Supply point not located.
-
RB4Retailer outside its geographic area.
-
RB5A prior B1 request (reason 01) is already in progress.
-
RB6A prior B1 request (reason 02) is already in progress.
-
RB7A prior B1 request (reason 03) is already in progress.
-
RB8A prior B1 request (reason 04) is already in progress.
-
RB9An in-progress non-cancellable deregistration-for-non-payment B1 request exists (reasons 01, 02 if the COR has rejected the transfer and work has already started to deregister, 04, or reason 03 during the process of terminating the access contract).
-
RC1Concurrence with a retailer change/COR transfer/holder change by transfer. The change activation takes priority over the termination.
-
RC2Reconnection not technically possible.
-
RC3Retailer in the process of being disabled.
-
RC4Disconnection not technically possible due to hazard.
-
RC5It is not possible to request a change/modification/registration/deregistration at a fixed date more than 30 calendar days in advance.
-
RC6Express objection from the holder on site. Documentation attached.
-
RC7Holder's impediment. Initiate the fraud process if applicable.
-
RC8Supply suspension rejected due to concurrence with deregistration for non-payment.
-
RC9Docket is incorrect or does not exist.
-
RD1Supply eligible for social bonus.
-
RD2Cancellation is not possible: no prior request exists.
-
RD3Does not comply with the normalised power or the established power multiple for the supply point.
-
RD4The requested voltage type is the same as the supply point's current type.
-
RD5Documentation missing as required by Law 12/2017 of the Balearic Islands.
-
RD6Holder of the underlying process does not match the holder seeking to withdraw.
-
RD7Withdrawal from an ongoing contracting process.
-
RD8Withdrawal not technically possible on site.
-
RD9Withdrawal not possible due to a subsequent contracting action.
-
RE1Reference request code does not exist at the distributor.
-
RE2The withdrawal does not apply to the underlying process.
-
RE3Withdrawal requested by a legal entity.
-
RE4Previous non-payment.
-
RE5CUPS subject to data protection legislation.
-
RE6Self-consumption type modification not permitted: fewer than four months have elapsed since the last modification.
-
RE7Distribution agreement and/or coefficients file is missing or incorrect; distribution coefficients are missing from the file.
-
RE8Technical information from the regional authority not received (for LV and <100 kW).
-
RE9The remaining modification requests for the collective have not been received within the established period.
-
RF1Consumer disagrees with the self-consumption information.
-
RG1Only the following can be modified: the identifier type and identifier, or the name and surname(s)/company name.
-
RG2Incorrect internal inspection; technical documentation after the inspection must be provided.
-
RG3Prior ATR request/claim code does not exist.
-
RG4Minimum vital supply.
-
RG5Modification applies to a social bonus.
-
RG6It is not possible to modify the distribution agreement or coefficients file if fewer than four months have elapsed since the last modification.
-
RG7If the ancillary services are not negligible and a single contract is registered, the installation type cannot be '03' (adjacent via network).
-
RG8The self-consumption modification request matches the contract in force.
-
RG9The modification request cannot incorporate other technical modifications.
-
RH1Self-consumption type is invalid.
-
RH2Subsection type is invalid.
-
RH3Collective self-consumption.
-
RH4The customer's installation cannot export energy to the network.
-
RH5A second power modification cannot be requested within the same billing cycle.
-
RH6The power reduction does not meet the requirements of Article 7 of RDL 18/2022.
-
RH7Self-consumption documentation is missing.
-
RH8In-flight agreement change.
-
RH9Request already submitted by another party.
-
RI1Holder of the underlying process does not match the holder seeking reinstatement.
-
RI2Reinstatement requested for installations above 1 kV.
-
RI3Reinstatement does not apply to the underlying process.
-
RI4Reinstatement not technically possible on site.
-
RI5Reinstatement not possible due to a subsequent contracting action.
-
RI6Reinstatement request exceeds the maximum period of one year.
-
RI7Concurrence with a reinstatement process; reinstatement activation takes priority.
-
RI8A prior in-progress request exists.
-
RJ1The contract to be reinstated has expired.
-
RJ2Documentary evidence is available.
-
RJ3Reinstatement rejected without a specific reason.
-
RJ4Requested technical modification matches the prior one at the distributor.
-
RJ5Incoming retailer rejects the reinstatement.
-
RJ6Reinstatement on an in-progress retailer change.
Example
"R01"